Note:
1. Before the installation of power (less than 0.8S time) to detect the operation of electronic control lock is flexible, check
the door to monitor the switch status is normal, confirm the working status are normal and then the actual installation
2. In the repeated continuous power test, the power rate must follow the 5% limit, otherwise it will burn the coil, such as
instantaneous power 0.8S, every 16S can only power once.
3. In the smart control lock tail leads to two two-core connector: connect the red and black two-wire connector for the
electromagnet power supply terminal; connect the white and blue two-wire connector for the closed monitoring terminal, two connectors Are both positive and negative.